Table of Contents

EVN TOG-meeting, Max Planck Institut für Radioastronomie, Germany, April 10, 2013

Agenda

  1. Local Arrangements/Opening Remarks (Alef, Lindqvist)
  2. Approval & last minute additions to Agenda (all)
  3. Acceptance of minutes from last meeting (all) Onsala June 28, 2012
  4. Review of Action Items from last meeting (all; see appended list)
  5. RadioNet3 (Lindqvist)
  6. Reliability/Performance of the EVN
    • Reliability/Performance of the EVN (Yang)
    • Pre-session checks, e.g., sampler stats, phase-cal, RFI … (Yang)
    • NME results (Yang)
    • Feedback from last sessions (Yang)
  7. Amplitude Calibration
    • Quality of calibration (Yang)
    • Timely delivery of ANTAB-files? (Yang)
    • DBBC ANTAB-files (Yang)
    • ANTAB-files other new systems (Yang)
    • DBBC Continuous calibration (Bach)
  8. Digital BBC-systems
    • DBBC development and production status, (Tuccari)
    • DBBC experience at stations (all)
    • DBBC feedback from JIVE (Campbell)
    • Operational issues with R1002 and CDAS (all)
    • R1002 and CDAS feedback from JIVE (Campbell)
  9. JIVE
    • Technical Operations and R&D at JIVE, (Szomoru)
  10. Sched Developments (Campbell)
    • Digital BBC-systems, Mark 5C etc.
    • New wide-band frequency standards
    • DBBC IF-channel naming convention in Sched
  11. 2-4 Gbps observations EVN, EVN+VLBA
    • Tests at 2-4 Gbps (Bach)
    • Boundary conditions for co-observing with the VLBA at 1-2 Gbps (Campbell)
    • EVN stations without DBBC: how will 2-4 Gbps be done? (all)
  12. Technical priorites for the EVN
    • RadioNet3 JRA DIVA Task 1: Low-noise wide-band integrated amplifiers for VLBI antennas (Alef)
    • RadioNet3 JRA DIVA Task 2: DBBC3 (Tuccari)
    • Mark 6, XCube, Flexbuff (Alef)
  13. Field System, status and new features
    • Status report, new developments (Himwich)
    • DBBC Tsys in PFB-mode (Tuccari, Himwich)
  14. Haystack
  15. Mark 5,6
    • Status: Mark 5A/B/B+/C, 6, software, firmware, SDK9 (Ruszczyk)
    • Issues regarding the upgrade to SDK9.2 (Verkouter)
    • New capabilities of jive5ab (Verkouter)
    • Mark 5 problems encountered during last session, (all)
    • Disk inventory and purchase status – 7000 € per station/year (Lindqvist, all)
    • Disk throughput at JIVE, balancing with NRAO, Astro/Geo pool (Campbell)
    • Mark 5 logistics (repairs, shipping rules, VLBA shipping requirements, boxes, labels, etc.) (all)
  16. NRAO
  17. Activities at EVN stations (all)
  18. Activities at potential new EVN stations
  19. Upcoming meetings (Lindqvist)
    • TOW, Haystack, May 6-9, 2013
    • 2nd International VLBI Technology Workshop, Jeju Island, Korea, 10-12 October, 2013
    • ERATec, TWS, Calibration workshop, Octtober 28-29, 2013
  20. Date and place of the next TOG meeting
    • Wettzell, December, 2013 or January, 2014
  21. AOB

Action Items from the Onsala meeting:

  1. Campbell to let friends know where to find relevant SCHED catalogue information. Note that there is a permanent action item, “stations should ensure SCHED catalogue information is up-to-date.”
  2. Szomoru to investigate if/how the number of ftp-tests could be increased, as a high time priority of the NEXPReS project.
  3. Lindqvist/Bach to circulate input from Graham concerning implementing of continuous calibration with the DBBC.
  4. Lindqvist to make sure that the next TOW covers all topics related to checking out a VLBI station.
  5. Lindqvist: investigate if extra money is needed for DBBC spare parts. (DBBC spare parts)
  6. All: check out the spare part list on the wiki and make sure that each institute contributes. https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/EVN_spare_parts
  7. Bach: Send out information on the Effelsberg 22 GHz phasecal system.
  8. Tuccari: investigate if the DBBC 16 MHz band shape can be improved.
  9. Lindqvist: put script that transfer GPS-data to vlbeer on the wiki.
  10. All L- and C-band stations: determine beam shapes at L- and C-band, if possible at different elevations. Send results, as well as the elevation intervals used, to Keimpema.
  11. Yang, Bach, Lindqvist, Himwich and Graham: discuss new ANTAB script, present conclusions at next TOG.
  12. Lindqvist/Szomoru: get Haystack Observatory to send official invitation to Nosov so he can participate in the DBC comparison workshop.
  13. All: Make sure that your station spends 7 keur/year on the purchase of disks.

Summary of ”Permanent” Actions/TOG recommendations

IN ADVANCE OF SESSION:

SESSION PREPARATION:

DURING SESSIONS:

POST SESSION FEEDBACK: